TOG & TOGMarine Division
Hands laying numbered teak planks
The process

How we work

The process

How we work

Teak plank selection and cutting
01

Selection & cutting

Each plank is graded, matched for grain and cut to its exact place on deck.

Dry-laying teak planks
02

Laying & fitting

Numbered planks are dry-laid and fitted by hand before a drop of adhesive is used.

Marine adhesive application
03

Bonding

Marine-grade adhesive is combed evenly across the substrate, section by section.

Calibrated weights pressing the deck
04

Pressing

Calibrated weights hold every plank under even pressure while the adhesive cures.

Caulked deck seams
05

Caulking

Seams are filled with marine caulking, then trimmed flush for a watertight deck.

Finished teak deck
06

Sanding & handover

The deck is sanded to a uniform surface and handed over ready for sea.

Soft furnishings

From the atelier
to on board

Fabric texture detail
01

Fabric & cutting

Fabrics from our exclusive portfolio, cut in the Perama atelier.

Sheer and blackout layers
02

Sewing & layers

Sheer and blackout sewn as independent, aligned layers.

Curtain installation at the shipyard
03

Fitting on site

Our own team installs at the shipyard or marina, wherever the yacht is.

Curtain drop dressed by hand
04

Dressing & steaming

Every drop dressed and steamed by hand to a perfect fall.

Roman shade on a stateroom window
05

Shades & blinds

Roman shades and blinds, made to the measure of every window.

Finished stateroom with roman shades
06

Handover

The interior delivered ready to sail.